• NaibofTabr@infosec.pub
    link
    fedilink
    arrow-up
    0
    ·
    edit-2
    7 months ago

    That’s plenty fast enough for a power grid.

    1.5% of 900MW is 13.5MW. That’s plenty of power output scaling per minute.

    • IchNichtenLichten@lemmy.world
      link
      fedilink
      arrow-up
      0
      ·
      edit-2
      7 months ago

      I think you’re getting peaker plants, e.g gas fired confused with load following.

      Nuclear plants are not used as peaker plants. you incorrectly stated that they are.