I would scale a 3 floor building by climbing down balconies before I call maintainence to let me out. Or toss some rope out the window and climb down I guess.
But I think I would even try taking the entire handle off before calling maintenance. Or even straight up texting a family member and waiting a few hours.
My wife, on the other hand, is the “I tried to wiggle it lightly a few times so now I am giving up”. Installed a new light last week, and it takes a split second to actually turn on. In the literal 600-800ms it takes to charge up, she flipped the switch 3 or 4 times, and loudly yelled about how the piece of shit we bought doesn’t work. I simply went over and flipped the switch up and left it there to actually power up.
I would scale a 3 floor building by climbing down balconies before I call maintainence to let me out. Or toss some rope out the window and climb down I guess.
But I think I would even try taking the entire handle off before calling maintenance. Or even straight up texting a family member and waiting a few hours.
My wife, on the other hand, is the “I tried to wiggle it lightly a few times so now I am giving up”. Installed a new light last week, and it takes a split second to actually turn on. In the literal 600-800ms it takes to charge up, she flipped the switch 3 or 4 times, and loudly yelled about how the piece of shit we bought doesn’t work. I simply went over and flipped the switch up and left it there to actually power up.
People like that 100% exist.
tbf I would definitely consider an 800ms delay on a light bulb as that light bulb not working and needing to be replaced
Taking the handle off is exactly what I’d do, no need to scale the side of a building lmao.