

They’ve finished using up all the old shuttle engines?
Nope! The RS-25 engines for Artemis III all flew multiple shuttle missions.
Alt accounts that are also me:


They’ve finished using up all the old shuttle engines?
Nope! The RS-25 engines for Artemis III all flew multiple shuttle missions.


https://bsky.app/profile/planet4589.bsky.social/post/3musjjvihxc2s
ISAR have now confirmed Spectrum’s orbit circularization burn. Hopefully we’ll get US Space Force TLE data tomorrow to provide independent confirmation of the orbit.


2026-09-05:


SECO, tentative 500 x 180 km orbit.
There is still a scheduled circularization burn.


Fairing separation confirmed.


MECO, stage separation, and upper stage ignition.


Spectrum has passed Max-Q.


Liftoff!


Propellant load is underway.
T-0 has slipped to 20:12 UTC, 22:12 local.


Joint ISAR / NSF webcast is live: https://www.youtube.com/watch?v=uUc2d_NPBN0
Cornfinement?


there any other potential sources of energy I haven’t thought of?
Wild card answer: Someone turned the Demon Core into a doorknob.


Is that a chocolate door handle?


Ooh, starting a new saga!


He tends to go on vacation after they successfully launch though
He does? He certainly wasn’t on vacation during Artemis II:
I don’t think there have been enough Artemis launches that one can infer a strong correlation to Eric Berger’s vacation days :)


Orbital parameters from Jonathan McDowell: https://bsky.app/profile/planet4589.bsky.social/post/3mupvwwwddk2c
EOS-05 (GISAT-1A) and the GSLV CUS upper stage cataloged by USSF in a 154 x 30963 km x 19.3 deg transfer orbit, confirming successful launch by India


2026-09-04:


2026-09-03:






















One small launch for rocket, one giant leap for propane and propane accessories!